Jonathan Ishmael OBJECTIVE: Proactive Professional who is successful leading
and mentoring others while achieving both business and project objectives.
Broad work experiences in the Chemical, Energy, Construction and
Manufacturing Industry. An overall knowledge of Project Management, Project
Controls, Material Management, and Engineering Processes. Extensive field
experience and formal training in construction projects Involving:
Capital Projects, Evergreen Projects, Turnarounds, and Revamp/Modernization. TECHNICAL EXPERTISE: · Relevant training: Primavera P6, P6
Administration Management, Agile Project Management, Earned Value Management
(EVM), Risk Management, Information Technology Security, Quality Assurance
Planner, Budget Analyses · Relevant certification: Primavera P6, P6 Admin,
PMO (DOW), PMP (Expected), Six Sigma, Cost Analyses (EVM) · Relevant Application: Primavera P6, MS Project,
Acumen Fuse SAP, VBA, MS Office (Suite), VISO, SharePoint EXPERIENCE: Project Controls Leader with a comprehensive
working knowledge of cost, scheduling, estimating, procurement and planning
within the Chemical and Energy industry at the project or field execution
level. Clark Construction (El Paso, TX) (Hospital) Lead Mitigation Scheduler (Contract)Jan – Current · Aligned the pay application (800M)
with the redeveloped schedule per the Corp Engineers contract · Analyzed variance issues from the
original baseline and developed new cost trending curves and reports to align
with redeveloped schedule · Managed and trained 3 Jr.
Schedulers · Redeveloped and audited the
Clark-McCarthyHP Primavera libraries · Designed cost/schedule interface
variance reporting and trained cost engineering staff on usage · Redeveloped the projects change
management system and integrated it into the redeveloped schedule · Worked with the Corp Engineers to
review original risk registrar and realign to new schedule · Trained project management staff
on Way to Schedule techniques · Drove the transition from monthly
construction updates to weekly construction updates Koch Industries (Wichita, KS) Jun – Dec 2015 Lead Project Scheduler (Large Capital and Turnaround) · Leading a staff of 16 schedulers
between Large Cap and Turnaround groups · Developed KASE’s P6 code and
recourse libraries · Created both capital projects and
turnaround scheduling policies and procedures · Designed P6 data base and
successfully implemented through phase 2 · Serving as Cap projects and
Turnaround P6 Admin manager · As the sole scheduling SME devised
a path forward for training all Cap and Turnaround scheduling staff · Implemented level 4 police for
construction “way to schedule” Foot Bridge Energy on Assignment to: Wood Group Mustang Engineering (Houston, TX)
Dec 2014- May 2015 Lead Project Controls Engineer (EPC) · Created phase 4 schedule utilizing
P&IDs and BIM model · Successfully created and
implemented project recovery plan using the CPM mythology with in P6 · Reconstructed project engineering
and procurement schedule to align to construction field need dates · Generate Daily, Weekly, and
Monthly work team management reports and maintained “Project Diaries” · Assist in driving down procurement
variation by coordinating between engineering and design disciplines · Utilized EVM tools to assist work
team management realign project schedule with initial budget DOW Chemical (Houston, TX)
July2013 – Dec 2014 Lead Project Controls Engineer (Polyethylene
Train/infrastructure) · Maintain and coordinate communication
between DOW management and engineering disciplines · Served as Lead P6 SME and trainer · Perform Earned Value schedule
impact analysis for contract negotiations · Perform critical path and Earned
Value Management analysis and generate as-needed reports · Review critical path, cost
loading, schedule content, use of relationships and lag, constraints and
milestones · Improved work processes by
developing a dynamic VBA based Earned Value Management tool and implementing
EVM training and procedures Lead Construction Scheduler Freeport, TX (Chlorine
Train and Water Treatment Facility) · Coordinated restructuring of
schedule via P&ID reviews · Utilized Plot plans and P&IDs
to create master construction schedule · Reviewed, evaluated and
rejected/approved contractor recovery schedules ·
Created
ad hoc project schedules in P6 as requested while maintaining and updating
the integrated master schedules ·
Incorporated
sub-contractors MS project files into the P6 Master file Enlightened Solutions (New Orleans, LA)
2005-2013 Project Controls Consultant (Civil
Eng./Design) · Utilized MS Project to develop and
maintain civil construction schedules · Developed Engineering and
Procurement schedules for owner reps utilizing Primavera (P6) · Preformed quality assurance
reviews for on initial third party construction schedules · Developed project remediation plan
including recourses, variances in the scope and project earned value U.S. Navy(Turn
around Planner) 2000-2008 EDUCATION: Southern Methodist University · Bachelor of Science: Engineering
Management & Information Systems o Minor: Applied Mathematics ACTIVITIES & ORGANIZATIONS · SMU
Student Senator• Student Senate
Diversity Committee · Habitat for Humanity•
Engineers With Out Borders AWARDS: •Navy Good Conduct Medal (2)•
Navy Achievement Medal •Navy Humanitarian Service Medal•
National Defense Service Medal |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|